Project Details Menard Solution A part of the 30 year masterplan, Al Falah Community is one of the biggest single developments in Abu Dhabi. The site is located about 40 km east of Abu Dhabi city centre, close to the International Airport as well as Yas Island leisure parks and Saadiyat Islands cultural [...]
Abu Dhabi Capital District UAE
asifameer2024-07-29T10:26:50+02:00Project Details Menard Solution Ground Improvement and Grouting Works for 10M m2 of Soil for the construction of the district that will be the new seat of the UAE's federal government. Selected Techniques: Compaction Grouting (CG) | Rapid Impact Compaction (RIC) | Stone Columns Treatment Area: 10000000m2 [...]
Construction of Roads 12,13,14 and 25
asifameer2024-07-03T11:49:20+02:00Project Details Menard Solution Menard Middle East were appointed by Main Contractor (GHANTOOT Transport & General Contracting) and Abu Dhabi General Services Company (MUSANADA) to provide a ground improvement solution for the Construction of Roads 12,13,14 and 25 located in Shakbout City Abu Dhabi. Historically the roads had been continually affected by recurring [...]
Amazon Fulfilment Centre FC Phase 1 UAE
asifameer2024-07-03T11:51:27+02:00Project Details Menard Solution The total plot area is divided into two phases where the current scope and proposal is covering only the buildings within Phase 1 only in addition to all the boundary wall around the whole plot (phase-1 and phase-2). Dynamic Replacement for building foundations and road/parking areas and Controlled Modulus [...]
Feed Mill Yanbu Industrial Port Saudi Arabia
asifameer2024-07-03T11:51:39+02:00Project Details Menard Solution The Proposed Soil Improvement technique was Controlled Modulus Columns given our past experience in the same area during the construction of the main feed mill. The owner requested Menard to execute the same technique for the above structure due to the speed of installation and it proven integrity. [...]
Riyadh Township Saudi Arabia
asifameer2024-07-03T11:51:49+02:00Project Details Menard Solution Dynamic compaction for 2,874,389 m2 of mixed used development project in Riyadh containing several buildings, hotels, medical centres, schools, entertainment and sports centres, part of development plan of the Kingdom’s Vision for 2030 for Riyadh. The works consisted of treatment of backfilled areas including 3m collapsible soil beneath it. [...]
Hudayriyat Priority Development Area (PDA), Abu Dhabi- UAE
asifameer2024-07-03T11:52:02+02:00Project Details Descriptions Hudayriyat Island is located off the southwest coast of Abu Dhabi Island and when fully developed will encompasses a lineup of cultural and ecological destinations in addition to residential properties, commercial spaces, and leisure facilities to encourage a healthier lifestyle for the whole community. The site has been divided into [...]
Neom Base Camp Kingdom of Saudi Arabia
asifameer2024-07-03T11:52:12+02:00Project Details Menard Solution 800,000 square meters in a duration of 1 month. Menard used a mix of High Energy Impact Compaction technique and Rapid Impact Compaction Technique, of which each technique was carefully chosen based on the backfill depth of the area subject to compaction based on the project specification. The entire [...]
Baniyas North Development UAE
asifameer2024-07-03T11:54:02+02:00Project Details Descriptions The project site is located in the Al Shamkha region of Abu Dhabi and is located approximately 40km from the centre of Abu Dhabi island and approximately 10km from the Capital District and Abu Dhabi International Airport. The proposed Baniyas North Development project comprises a development area of ~900 ha [...]
Quay Wall 100-Dekhela Port
asifameer2024-07-03T11:54:06+02:00Project Details Menard Solution Alexandria Port Authority intends to construct a new terminal at El Dekheila Port. The project comprises the construction of quay wall so-called (QW100). EDECS have appointed Menard as specialized ground Improvement contractor to carry out the scope of soil improvement works. The project requires soil improvement works by using [...]