This technique can substantially reduce consolidation time thanks to early pre-loading as soon as the system is in place and without risk of ground failure. The isotropic nature of the Menard Vacuum™ load and the “artificial beam” generated by the vacuum between the horizontal drains and the membrane have a strong stabilizing effect on the fill.