Project Details Menard Solution Freyssinet Menard Northern Emirates (FMNE) (Menard) was contracted to carry out the soil improvement under the future 1800 MW Power Plant in Sharjah UAE. FMNE as a ground improvement specialist were tasked with assessing the soil and offering a suitable ground improvement technique to ensure that project requirements for [...]
Amazon Fulfilment Centre FC Phase 1 UAE
asifameer2024-07-03T11:51:27+02:00Project Details Menard Solution The total plot area is divided into two phases where the current scope and proposal is covering only the buildings within Phase 1 only in addition to all the boundary wall around the whole plot (phase-1 and phase-2). Dynamic Replacement for building foundations and road/parking areas and Controlled Modulus [...]
Neom Base Camp Kingdom of Saudi Arabia
asifameer2024-07-03T11:52:12+02:00Project Details Menard Solution 800,000 square meters in a duration of 1 month. Menard used a mix of High Energy Impact Compaction technique and Rapid Impact Compaction Technique, of which each technique was carefully chosen based on the backfill depth of the area subject to compaction based on the project specification. The entire [...]