Project Details Menard Solution The total plot area is divided into two phases where the current scope and proposal is covering only the buildings within Phase 1 only in addition to all the boundary wall around the whole plot (phase-1 and phase-2). Dynamic Replacement for building foundations and road/parking areas and Controlled Modulus [...]
Riyadh Township Saudi Arabia
asifameer2024-07-03T11:51:49+02:00Project Details Menard Solution Dynamic compaction for 2,874,389 m2 of mixed used development project in Riyadh containing several buildings, hotels, medical centres, schools, entertainment and sports centres, part of development plan of the Kingdom’s Vision for 2030 for Riyadh. The works consisted of treatment of backfilled areas including 3m collapsible soil beneath it. [...]
Hudayriyat Priority Development Area (PDA), Abu Dhabi- UAE
asifameer2024-07-03T11:52:02+02:00Project Details Descriptions Hudayriyat Island is located off the southwest coast of Abu Dhabi Island and when fully developed will encompasses a lineup of cultural and ecological destinations in addition to residential properties, commercial spaces, and leisure facilities to encourage a healthier lifestyle for the whole community. The site has been divided into [...]
Neom Base Camp Kingdom of Saudi Arabia
asifameer2024-07-03T11:52:12+02:00Project Details Menard Solution 800,000 square meters in a duration of 1 month. Menard used a mix of High Energy Impact Compaction technique and Rapid Impact Compaction Technique, of which each technique was carefully chosen based on the backfill depth of the area subject to compaction based on the project specification. The entire [...]
Baniyas North Development UAE
asifameer2024-07-03T11:54:02+02:00Project Details Descriptions The project site is located in the Al Shamkha region of Abu Dhabi and is located approximately 40km from the centre of Abu Dhabi island and approximately 10km from the Capital District and Abu Dhabi International Airport. The proposed Baniyas North Development project comprises a development area of ~900 ha [...]
Al Forsan UAE
asifameer2024-07-03T11:57:07+02:00Project Details Descriptions Menard has been invited by M/s. Ghantoot Marine Constructions Sole Proprietorship LLC to design and execute Ground Improvement Works for “Al Forsan International Sports Resort Enhancement, Package 1. Ground improvement works by means of Vibro replacement (VC) using Dry bottom feed Stone Columns shall be required for the project of [...]